top of page

LeBreton STEM Hub

What:

STEM Learning Building

STEM Learning Building

Year:

2022

The LeBreton STEM Hub at St Brendan's College, Yeppoon, is home to Science, Technology, Engineering and Maths (STEM) learning at the school, featuring wet & dry science labs, a large internal court, and a flexible learning area / lecture theatre.

The building connects into the existing LeBreton building through a new upper level walkway. The existing building has also been refurbished on the upper level to form 4 new classrooms with 2 shared breakout rooms.

What:

STEM Learning Building

Where:

St Brendan's College, Yeppoon

contact us

Rockhampton Office: 3/171 Bolsover Street, Rockhampton

Brisbane Office: Lobby 1, Level 2, 76 Skyring Terrace, Newstead

t: (07) 4927 9700   e: admin@tmarchitects.com.au

© 2023 by Tony Madden Architects and created with Wix.com

bottom of page